We all know that Turbo Pulverizer of Cinder is a very strong airflow crushing equipment, many stubborn hard materials encountered a crusher, will be cut into a uniform block,
a Turbo Pulverizer of Cinder costs, if you want to use Turbo Pulverizer of Cinder for a long time, please pay attention to the following:
During the production process, the temperature rise of the bearing should be checked often, when the temperature rise exceeds At 50 ° C, the examination should be stopped, find out the cause, and troubleshoot.
2. When the new machine is running, the transmission belt is easy to eliminate, so it should be noted to adjust the appropriate tightness of the belt to ensure the life of the belt.
3. Test and timely replacement of vulnerable parts should be performed in time to ensure quality and production.
4. The wear of the blade and bushing should be continuously checked. If the productivity is lowered, the particle size is thick after wear, and the wear is immediately replaced.
5.Turbo Pulverizer of Cinder host and level distribution bearing use 2 special grease (265-295 degrees) lubrication.
6. The replacement period of the bearing is 2000 hours, and the amount of oil filling of the bearing chamber gap is 1 ≤ 2 (try) or 3 ≤ 4 (try), if it is not too much, the bearing temperature Will be too high.
7. The replacement period of the spiral feeder is 4,000 hours, and ordinary calcium based grease is added. Standard operation to exchange for longer use of airflow crushers.
The above is a seven-point introduction to the daily maintenance of Turbo Pulverizer of Cinder for you.
ALPA Gypsum Turbo Pulverizer of Cinder Case Sharing: The company is a more well-known non-metallic mine company in South Africa. The main product of the company is a super fine superchard. Micro powder, the company learned about our equipment through our website, read our case, finally chose to buy our company's Turbo Pulverizer of Cinder as its gypsum ultrafine powder production line.
Technical parameters:
Finished granularity: D97: 5UM
Production capacity: 140kg
1, when crusher homework, The operator should stand in the direction of the hammer rotation, and if you don't wear your gloves, your hands must exceed the safety line, moreIt is not allowed to use iron and sticks instead of hand feed.
2, pulverizer and power unit should be installed firmly. If the equipment is fixed for a long time, it should be fixed on the cement; if the device is a mobile operation, the unit should be installed on the base made of angle iron, and ensure that the belt wheel groove of the power machine (diesel or electric motor) and the equipment is in the same Rotary plane.
At the same time, check if the leather belt looseness is appropriate.
4 Whether the power machine and the pulverizing machine are lubricated.
5, don't just replace the pulley, prevent the transition chamber to produce explosion, or the speed of the pulverizer is too low.
7. At any time, pay attention to the operation of the equipment, the feeding should be uniform, to prevent blocking bullies, do not have a long time overload. If there is found that vibration, noise, the bearing and the body temperature is too high, the outer spray, etc., should be closed immediately, and the fault can be eliminated.
8. When blocking occurs, it should be stopped immediately. It is strictly forbidden to use a wooden stick or hand to feed or pull out the feed to avoid the pulverizer to wound the arm or damage the machine.
9. If you crush a hard raw material, the operator must wear glasses.
10, the workplace should have a ventilator and strictly prohibit fireworks to prevent dust explosion from fire.
For more information, please pay attention to Shan Dong Alpa. The company mainly has airflow pulverizer, airflow mill, pharmaceutical gas flow pulverizer, disc air pulverizer, eddy current pulverizer.